| Scrappy Quilt Top for Sewing Group |
Nancie's TN Quilts
Welcome - Hope you enjoy your visit
Monday, February 19, 2018
Scrappy Quilt Top
Saturday, February 10, 2018
Country Boy Quilt Top
In late October 2017, I discovered (2) kits that were donated to our Sewing Group. One was called "Country Boy Pattern #403" and the other was "Country Girl Pattern #402". These were pre-cut quilts from Creekside Quilts. The fabric was quite light weight and it dates from the early 1980's.
Lolita from our Quilt Guild donated some plaid fabric several years ago and I thought her fabric would be great for the boy's shirts instead of the floral fabric that came with the kits.
Lolita from our Quilt Guild donated some plaid fabric several years ago and I thought her fabric would be great for the boy's shirts instead of the floral fabric that came with the kits.
| Country Boy Quilt Top |
Friday, February 9, 2018
Fabric Journal is complete
I began the Fabric Journal in Nov. 2015 and made the covers. I began again in May 2016 through Dec. 2017. My husband provided his expertise by placing the grommets today, so I was able to finish the Journal this afternoon. I need to focus on planning prior to beginning a project since not all my journal pages were the same size. Oh, well--it's O.K. because I'm thrilled to have finished it and can show it tomorrow at our Quilt Guild meeting. We are beginning another UFO Challenge for 2018 and the first UFO is due tomorrow. Here's a picture or two.....
| Front Cover of my Fabric Journal |
| Inside Front Cover of Journal |
Wednesday, February 7, 2018
Country Boy Pattern #403
The last couple of days I have been working on the Country Boy blocks. I started them in late October 2017. In looking at the top on the Design Wall, I know the sides need borders too. Those will need to wait for another day.
This afternoon, I need to get going on the Quilt of Valor kit that I began on Saturday, Feb. 3rd. I still need to sew the sashing and the cornerstones around each block and add the borders before I can turn it back in to our Group Leader. After re-reading the instructions at home, I realized that I had sewn each and every block (40 to be exact) wrong. So, I spent all day Monday, un-sewing every block and sewing each one back with the matching fabric.
This afternoon, I need to get going on the Quilt of Valor kit that I began on Saturday, Feb. 3rd. I still need to sew the sashing and the cornerstones around each block and add the borders before I can turn it back in to our Group Leader. After re-reading the instructions at home, I realized that I had sewn each and every block (40 to be exact) wrong. So, I spent all day Monday, un-sewing every block and sewing each one back with the matching fabric.
Thursday, February 1, 2018
UFO #1 has been chosen for February 2018
Yes, I am taking the Patchwork Times Challenge in hopes of finishing up at least (12) UFO projects.
UFO#1 was chosen by Judy for February 2018. Several months ago, I tried to begin quilting one of 365 Day Quilts from 2016. I added batting and began to quilt. Quickly, I discovered that was not going to work. First, I will need to take out the quilting I started and remove the batting. Since the quilt top is quite heavy with all the embellishments, I think it will be best to skip the batting and just back the top and hopefully it will work. Obviously, I will still need to machine tie it in many places. I loved making these quilt tops, so just cannot leave them as is.....
This Challenge actually consists of two quilts. One Quilt covers January through June. The Second Quilt covers July through December 2016. Each square finishes at 4 inches and consists of two triangles with a circle and a few words of what happened that day.
UFO#1 was chosen by Judy for February 2018. Several months ago, I tried to begin quilting one of 365 Day Quilts from 2016. I added batting and began to quilt. Quickly, I discovered that was not going to work. First, I will need to take out the quilting I started and remove the batting. Since the quilt top is quite heavy with all the embellishments, I think it will be best to skip the batting and just back the top and hopefully it will work. Obviously, I will still need to machine tie it in many places. I loved making these quilt tops, so just cannot leave them as is.....
This Challenge actually consists of two quilts. One Quilt covers January through June. The Second Quilt covers July through December 2016. Each square finishes at 4 inches and consists of two triangles with a circle and a few words of what happened that day.
Thursday, January 25, 2018
QOV Presentation Cases completed

First, I need to determine what is needed for each Quilt of Valor. I believe that all (4) need to be sent to a Long Arm Quilter with a wide backing. The packaging and mailing seems to always be my hang-up. This last week, my husband ordered some mylar plastic bags (24" square) for mailing the QOV tops and backing fabrics to the LAQ, along with some address labels. This should be so much easier. We were having to find boxes for mailing.
Thursday, January 18, 2018
Working on January's UFO pick
Yesterday, I started work on my Tote Bag (again). Last week, before the snow began falling in middle Tennessee, my husband & I went and purchased a huge sheet of "foam board" for my Tote Bag. Presently, the foam board is perched on the couch and my husband is hoping it will not become a permanent fixture in our library. It really isn't very becoming. I did get the pockets sewn, in order to allow us to slide the (3) foam board sections into the Tote Bag. My husband also knows that he will be the one measuring and cutting the foam board and I know he just can't wait.
Another project that has been waiting since Nov. 2015 is my Fabric Journal. I have the covers made and a few pages but this morning, I have discovered 16 photo transfers that I wanted to include. That means more pages needed. Planning does not seem to be one of my talents but I will keep plugging along.....
Another project that has been waiting since Nov. 2015 is my Fabric Journal. I have the covers made and a few pages but this morning, I have discovered 16 photo transfers that I wanted to include. That means more pages needed. Planning does not seem to be one of my talents but I will keep plugging along.....
Subscribe to:
Posts (Atom)